Capability radar
Product vs category average
嘉上 JS-IM-200 商用方冰制冰机日产冰量约 190kg,搭配储冰箱可储冰 144kg,产出 28×28×32mm 实心透明方冰,坚硬且不易融化。采用全封闭水回路与喷淋制冰,自动清洗并通过食品级卫生认证;智能控制优化能耗,标配通信接口支持联网监控,风冷运行噪音低,适用于茶饮、酒吧、酒店等高频用冰场景。 This guide explains where the commercial ice maker fits, which configuration details matter and what must be confirmed before deployment.
Radar and comparison values show the dimensions used to evaluate equipment capabilities.
Product vs category average
Product / manual / comparable equipment
The curve simulates output from opening to close, with peak periods marked separately.
08:00—23:00 · service window
Morning and evening create two demand peaks, with a steadier afternoon period.
Illustrative planning assumptions only; actual results depend on the confirmed store model.
The sequence illustrates typical machine actions; the real scope depends on verified hardware and software.
Ingredient compatibility · target accuracy 99.5%
Temperature and sequence · recipe driven
Output variance target · ±2%
Completion log · operating dashboard
Public specifications are shown below. Confirm the selected model and nameplate data before procurement.
| Cooling | Configured |
|---|---|
| Dimensions | 560×820×1886 mm |
| Energy | 15.39 kWh/100kg |
| Ice Output | 190 kg/24h |
| Ice Storage | 144 kg |
| Ice Type | Configured mm |
| Power | 930 W |
| Refrigerant | R404A/500 g |
| Voltage | Configured V/Hz |
| Water Consumption | 0.42 m³/24h |
| Water Source | Configured bar |
| Weight | 69/37 kg |
These capabilities should be evaluated against menu, volume, staffing and existing processes.
The Continuous ice production capability of the 商用制冰机 JS-IM-200 should be validated against the actual store workflow.
The Storage and dispensing coordination capability of the 商用制冰机 JS-IM-200 should be validated against the actual store workflow.
The High-temperature scenario planning capability of the 商用制冰机 JS-IM-200 should be validated against the actual store workflow.
The Maintenance tracking capability of the 商用制冰机 JS-IM-200 should be validated against the actual store workflow.
Configuration decisions should start from the store workflow and labour model.
The issue 'Summer peaks can exceed available ice' should be converted into a measurable configuration and acceptance requirement.
The issue 'Storage competes with floor space' should be converted into a measurable configuration and acceptance requirement.
The issue 'High ambient temperatures reduce output' should be converted into a measurable configuration and acceptance requirement.
The issue 'Condenser and drainage maintenance may be missed' should be converted into a measurable configuration and acceptance requirement.
For 'Summer peaks can exceed available ice', track waiting time, rework, ingredient variance and operator feedback.
For 'Storage competes with floor space', track waiting time, rework, ingredient variance and operator feedback.
For 'High ambient temperatures reduce output', track waiting time, rework, ingredient variance and operator feedback.
For 'Condenser and drainage maintenance may be missed', track waiting time, rework, ingredient variance and operator feedback.
In the Tea-store ice supply scenario, the 商用制冰机 JS-IM-200 connects preparation, recipes, service and handover into one repeatable workflow.
When the main problem is 'Summer peaks can exceed available ice', equipment should handle repeatable actions while operators retain clear responsibility for exception handling.
Validate Continuous ice production during both peak output and end-of-shift cleaning, not only in a single ideal-cycle test.
For a store considering the 商用制冰机 JS-IM-200, start by quantifying cup volume, menu structure and service periods, then assess whether 'Summer peaks can exceed available ice' is a problem the equipment can solve.
Compare preparation, output, cleaning and replenishment across one representative shift instead of comparing nameplate speed alone.
In the Hotel and bar storage scenario, verify recipe permissions, continuous output and exception handling with named operating responsibilities.
For 'Storage competes with floor space', record variance, rework and training time during the pilot and include the result in acceptance evidence.
The proposal should define consumables, cleaning frequency, spare parts and remote support boundaries for the 商用制冰机 JS-IM-200.
Compare equipment cost, site changes, training and maintenance together, using Storage and dispensing coordination as a technical validation point.
The 商用制冰机 JS-IM-200 is designed for commercial beverage operations that need repeatable recipes, continuous output and visible operating data. Buyers also search with terms such as commercial ice machine, industrial ice machine, automatic ice maker, commercial ice machine, cube ice maker; these expressions describe similar capabilities, while the final configuration still requires confirmation.
Deployment planning should map the 商用制冰机 JS-IM-200 to the menu, peak volume, ingredient flow and existing staff responsibilities before the equipment mix is finalized.
For Tea-store ice supply, confirm menu count, peak output, replenishment position and cleaning handover.
For Hotel and bar storage, confirm menu count, peak output, replenishment position and cleaning handover.
For Restaurant kitchens, confirm menu count, peak output, replenishment position and cleaning handover.
For High-volume retail, confirm menu count, peak output, replenishment position and cleaning handover.
Verify final dimensions, capacity and utilities against the selected model and nameplate.
This configuration guide focuses on the JS-IM-200 and the decisions required for a representative commercial installation.
Deployment covers site preparation, operation and ongoing responsibility.
Before deployment, confirm and document: Confirm peak ice demand.
Before deployment, confirm and document: Check ambient temperature and airflow.
Before deployment, confirm and document: Verify water and power.
Before deployment, confirm and document: Plan condenser cleaning.
Convert 'Confirm peak ice demand' into a site-check item with an owner, due date and acceptance evidence.
Convert 'Check ambient temperature and airflow' into a site-check item with an owner, due date and acceptance evidence.
Convert 'Verify water and power' into a site-check item with an owner, due date and acceptance evidence.
Convert 'Plan condenser cleaning' into a site-check item with an owner, due date and acceptance evidence.
Run a representative menu and peak-period workflow before acceptance.
Record output, exception handling, cleaning time and replenishment rhythm for the 商用制冰机 JS-IM-200, then confirm the interface with actual operators.
The final equipment scope should be documented through sample tests, site checks and written acceptance criteria.
Confirm the menu, volume, site conditions and delivery scope, then verify the 商用制冰机 JS-IM-200 configuration and public specifications.
Combine peak cups, ice per cup, storage volume and local ambient conditions.
Send your requirements and our team will follow up with a configuration recommendation.
Leave your company, contact and project requirements. We will follow up with equipment, site and delivery recommendations.